The P6 CIP solution is provided by the plant CIP system. The machine is connected to the plant CIP line and cleaned internally through fixed spray nozzles and (for the juice collection circuit) a counter-flow backflush through the juice line.

Discussion

Rough design & intent

Plant CIP cycle (typical)

Actual durations depend on cleaning results and the plant's CIP performance (pressure, temperature, concentration). Chemical indicator tests are required to confirm no cleaning solution remains.

  1. First water rinse — basic material removal.
  2. Lye / soap solution — cleaning chemistry step.
  3. Final water rinse — remove chemical material; verify with indicators; add additional rinse if needed.

Spray nozzles (P6)

DFM & integration (China)

Open items (requires further design)

Questions for contractor

  1. Propose nozzle types, spray patterns, and mounting angles to achieve full coverage without collisions across the full stroke.
  2. Specify CIP manifold tubing sizes, fitting standards, and flexible hose requirements for feeder open/close motion.
  3. Validate the juice-circuit counter-flow backflush approach (valving, check valves, pressure limits) and define an acceptance test plan.
  4. Recommend validation steps using chemical indicators and define rinse criteria to ensure no chemical residue remains.

Components

Status

System-level concept captured. Still TBD: nozzle selection, spray angles, connection standards, flow rate, and operating pressure. Add figures showing nozzle locations and manifold routing as they are defined.

Recommended figures (contractor clarity)